CheckPoint 1.3.240 Released

This version adds support for loading in BGP CSV Format Attributes

We’ve also added in a new PERCENT() macro to simplify the generation of percent values.

The macro is formatted as either PERCENT(VALUE1,VALUE2) or PERCENT(VALUE1,VALUE2,DECIMALS)

e.g. PERCENT(3,4) will output 75%.
e.g. PERCENT(3,4,2) will output 75.00%.
If the number of decimal places is not specified, it will be determined from the input data values

CheckPoint 1.3.238 Released

This version adds a “Preplot Line Completed” table and associated attributes to the reporting output for OBN projects.

It also adds in Category Counts for multiple vessel and ROV activities.

CheckPoint 1.3.237 Released

This version adds in a new TRIM macro, which removes any leading and trailing space or newline characters from a text value. 

There are also a couple of new field options added into the Receiver Node Data Entry

CheckPoint 1.3.236 Released

This version contains a number of minor updates

  • The report map has been updated to be able to show node activity per specific preplot section
  • There is now an option in the map settings for acquisition lines to show a label of the line name or sequence number

 

CheckPoint 1.3.234 Released

This version contains two minor updates

Firstly, the “Add Attributes” button in the Multiple Data Link widow so that it doesn’t clear out any existing attributes when used

Secondly, the Current Viewer and P1 Mapper have been updated to load the NADCON datafiles correctly.