This version adds in a “Grout Length” data entry option and associated report outputs for geotechnical projects.
Author Archive: TOwen
CheckPoint 2.0.178 Released
This version updates the data entry options for geotechnical sampling projects
CheckPoint 2.0.176 Released
This version adds three additional computations into the MMO operations timing breakdown
- Soft Start to Full Power for Acquisition Lines Only
- Soft Start to SOL for Acquisition Lines Only
- Full Power to SOL for Acquisition Lines Only
CheckPoint 2.0.175 Released
This version updates the MMO attribute totals to compute correctly from the underlying table values.
The JNCC output can now be generated for a specific vessel.
CheckPoint 2.0.174 Released
This version updates the handling of image files to cater for JPEG-format files where the image rotation is specified in the EXIF metadata
CheckPoint 2.0.173 Released
This version adds in an option for a user to expand a report group to it’s constituent parts
NavPoint 1.0.122 Released
This version updates the checking of Bin Grid locations, fixing a bug in the checking of bin grids with a non-unity increment and integer axes.
CheckPoint 2.0.172 Released
This version updates the backup restoration process to handle database structure differences
This version also adds in a change to the preplot report table – this now contains shot-by-shot computed totals.
NavPoint 1.0.121 Released
This version contains the following updates:
- Fixed Checking of Coordinate System Type for EPSG versions less than 9.6
- Updated Checker to check for example points on I and J axes requirement for P6/11
CheckPoint 2.0.170 Released
This version updates the HSE Incident recording to add in Category and Severity fields as required by certain clients