This version contains a number of minor updates.
In the project setup, it is now possible to specify the Client Representative Names and Email, and the Contractor Party Chief Name and Email by a date range.
The options to caption a report image have been improved.
The system now decodes AIVDO AIS messages alongside the existing AIVDM support.
Finally, the report output from the Waste Disposal data entry has been improved when in multiple vessel mode.