CheckPoint 1.1.146 Released

This version contains a new project configuration setting enabling time logging in shot edits. When this option is enabled you can enter the start and end time of a shot edit and the system will compute and maintain the duration of the edits.

There is also a minor update to the report output tables ensuring that a zero value will be written as “0” in the table and not left blank.

Posted in CheckPoint.